evoBuild GGBS

Heidelberg Materials UK · Ground granulated blast furnace slag (GGBS)

A ground granulated blast furnace slag made by drying and grinding granulated slag from iron making, supplied as a Type II addition to BS EN 15167 (S1, S2). It is combined with cements such as CEM I and CEM II/A-LL at the concrete plant, or used in blended cements (S1, S2).

Where It Is Used

As stated by the manufacturer (S1):

  • Concrete, mortar and grout, including ready mixed concrete, precast concrete, paving and street furniture.
  • Soil stabilisation and other specialist applications.

Stated conditions and restrictions (S1):

  • Latent hydraulic binder: it needs the alkali environment of cement to react, so setting is extended and 1, 3 and 7 day strengths are lower; the data sheet says parity can typically be reached at 50% replacement against an equivalent CEM I concrete.
  • Maximum replacement levels must follow BS EN 206 and BS 8500 for the design chemical class, exposure condition and strength; trial mixes are recommended.
  • Concrete placed generally within 5 to 30 °C; cure for at least the first seven days; protect from frost.
  • Colour is lighter and cannot be guaranteed.

Technical Specifications

Values from the maker's documents listed at the end of this page. Check the current version with the maker before you specify.

PropertyValueUnitTest standardSource document
Product standardBS EN 15167 (EPD cites BS EN 15167-1)BS EN 15167-1S1 p1; S2 p3
Addition typeType II additionBS EN 206 terminologyS1 p1
CompositionBlast furnace slag 100% by weight%S2 p3
Dry bulk density1100.0kg/m³not statedS2 p3
Chemical criteria citedCriteria listed for the CaO, SiO2 and MgO content, the (CaO + MgO)/SiO2 ratio and a glass ratio above 66 %; comparison symbols are not legible in the text extraction, so read EPD page 3 directlyEN 197-1S2 p3
Typical replacement of Portland cement30% to 85%; common use 40% to 50%%S2 p3
Fineness, setting time, soundness, mortar prism strengthnot published in the data sheet; per-works certificates referenced (not published)BS EN 15167-1S1 p1
GWP-total, A1-A31.55e+02 per 1 tkg CO2 eq.EN 15804+A2S2 p5
GWP-fossil, A1-A31.55e+02 per 1 tkg CO2 eq.EN 15804+A2S2 p5
Water use (WDP), A1-A31.32e+01 per 1 tm³ world eq. deprivedEN 15804+A2S2 p5
Declared GWP figure in data sheet155 per tkg CO2erefers to EPDS1 p2

Notes on the EPD figures: declared unit 1 t; modules A1 to A3 only (cradle to gate); study year 2022; economic allocation of blast furnace impacts between pig iron and slag (S2 p4). A per-tonne binder figure is not a concrete figure: comparisons between mixes need the concrete mix design.

Product Documents

DocumentReferenceIssued byStatus on 9 October 2026Link
Declaration of PerformanceOne per production site (Purfleet, Port Talbot, Teesside), to BS EN 15167-1Manufacturer-issuedReferenced in S1 and S2; not located or opened (not published)Manufacturer document library
UKCA markingStated in S1Manufacturer statement; third-party conformity certification statedCertificate not opened (an earlier certificate URL returned HTTP 404)S1
EPDNEPD-8767-8422-2, "UK Average Regen GGBS", EN 15804+A2, PCR NPCR018, issued 20.01.2025, valid to 20.01.2030Programme operator EPD Norge; independent external verification statedEPD document opened (manufacturer-hosted copy); EPD NorgeS2
Management systems listed in the EPDISO 9001, ISO 14001, ISO 45003, BES 6001, ISO 50001Certificates issued by third partiesCertificates not opened (not published)S2 p2
ETA, BBA, CodeMarkNot applicable or not found

About Heidelberg Materials UK

  • Company: Heidelberg Materials UK, Second Floor, Arena Court, Maidenhead SL6 8QZ, United Kingdom (address as printed in S2).
  • Production and availability: available nationwide in the UK; production sites at Purfleet, Port Talbot and Teesside; distribution depots at Glasgow and Teignmouth (S1).
  • How to buy: delivered by the company's tanker fleet; customers with their own tankers can collect from some works or depots by prior arrangement (S4). Contact routes are listed on the depot pages (S4).

Sizes and Supply

ItemPublished
FormatBulk (tanker delivery or collection)
Next-day deliveryStated as available on orders placed before midday (company-wide statement on the depot page)
Bagged formatnot published
Price, MOQnot published: not published

Before You Specify

  • Obtain the DoP for the specific production site supplying the project; DoPs are issued per site (S1).
  • The product was renamed: confirm that delivery documents, DoP and EPD name the same product (the EPD still reads "Regen").
  • Confirm the maximum replacement level for the exposure class and strength class with the concrete producer under BS 8500 and BS EN 206; run trial mixes (S1).
  • Plan for slower early strength and extended setting, especially in cold weather (S1).
  • The EPD covers A1 to A3 only and uses economic allocation; check the allocation method used by any other EPD before comparing.
  • Confirm the EPD's validity on the EPD Norge register.